How to operate the power transformer

Pandan la operasyon of the transformer, the operasyon and maintenance must be carried out in strict accordance with the operating procedures of the main transformer. When the transformer is normal, two coolers are put into operation automatically, and one cooler is for standby. When the standby pump starts automatically, the standby pump must be checked. The main reasons for the automatic startup of the standby pump are: the winding temperature reaches 105 ° C, the maximum oil temperature reaches 80 ° C, the pointer of the operating oil flow indicator stops again during operation, the submersible pump fails during operation, and the thermal relay operates and outputs. When the water flow of water pipe flowmeter is less than 2.7 × 100L/min; When only one cooler is running, the transformer chaje va not exceed 70%, the running time shall not exceed 30 minutes under full load operation, and the running time shall not exceed 3 hours under no-load operation; During normal operation of transformer, the temperature rise of winding shall not exceed 65K, that of top oil shall not exceed 55K, that of iron core shall not exceed 80K, and that of oil tank surface shall not exceed 65K. When the transformer load exceeds the rated load, the operation time of the transformer shall be strictly controlled. When the operating load is 1.3 times of the rated load, the continuous operation time shall not exceed 120 minutes. When the operating load is 1.45 times of the rated load, the continuous operation time shall not exceed 80 minutes. When the operating load is 1.5 times of the rated load, the continuous operation time shall not exceed 45 minutes. When the operating load is 2.0 times of the rated load, The continuous operation time shall not exceed 10 minutes.

How to operate the power transformer-SPL-transfòmatè pouvwa, transfòmatè elektrik, konbiné poste kontra enfòmèl ant, Metalclad AC enclosed switchgear, switchgear Low Voltage, switchgear andedan kay la AC metal rekouvèr entèmedyè switchgear, transfòmatè pouvwa ki pa enkapsulasyon sèk-kalite, transfòmatè sèk-kalite bobin ki pa anvlope, résine epoksidik jete fèy asye silikon. transfòmatè sèk-kalite, résine epoksidik jete alyaj amorphe transfòmatè sèk-kalite, transfòmatè alyaj amorphe lwil oliv-immersion pouvwa, silicone asye fèy lwil oliv plonje pouvwa, transfòmatè elektrik, transfòmatè distribisyon, transfòmatè vòltaj, transfòmatè etap-desann, redui transfòmatè, ba- transfòmatè pèt pouvwa, transfòmatè pèt pouvwa, transfòmatè lwil oliv, transfòmatè distribisyon lwil oliv, transfòmatè-lwil oliv-lmmersed, transfòmatè lwil oliv, transfòmatè lwil oliv tranfòmatè, twa faz transfòmatè lwil oliv benyen, transfòmatè elektrik plen lwil oliv, transfòmatè pouvwa alyaj amorphe sele, kalite sèk Transfòmatè, transfòmatè sèk, transfòmatè kalite sèk rezin, transfòmatè sèk, transfòmatè résine, transfòmatè rezin, CR DT, Transfòmatè pouvwa bobin ki pa anvlope, transfòmatè sèk twa faz, poste inite atikile, AS, poste modil, poste transfòmatè, poste elektrik, estasyon pouvwa, poste pre-enstale, YBM, poste prefabrike, poste distribisyon, estasyon kontra enfòmèl ant, estasyon elektrik MV, Estasyon elektrik LV, estasyon elektrik HV, kabinè switchgear, kabinè switchgear MV, kabinè switchgear LV, kabinè switchgear HV, kabinè switch rale-soti, switchgear rezo bag fèmen metal AC, switchgear santral blende metal andedan kay la, sous-kalite bwat, transfòmatè koutim, transfòmatè pèsonalize, metal ki fèmen elektrik switchgear, LV switchgear kabinè,